Preparation of prefabricated components of steel structure before installation

2023-07-24
Whether it is a Steel Structure factory building, a street bridge and other types of steel structure projects, some steel prefabricated components must be hoisted before installation.
Steel frame structure lifting production process: accurate positioning---determine the design elevation---embedded parts of the anchor bolts on the top of the column---determine the design height---setting out the wire---column installation---steel beam installation---secondary structure installation---electric welding and welding---painting---completion.

Steel column installation and processing technology.

Reinforcement hoisting:

1. Carry out basic measurements, including the exposed length of chemical bolts, the deviation between the axis of chemical bolts and the reference point, the interval of chemical bolts, and the basic design elevation. Lifting can only be carried out after unqualified solutions are resolved.

2. In order to control the installation design elevation of the column, the position of 500mm is drawn on the cross section of the column in advance, so as to facilitate the adjustment and calibration of the design elevation during installation. For the installation of steel columns on the basis of meeting the retest standard, first bind them with a single galvanized steel wire rope, and the lifting part.


steel structure cases

Related Products List

Home

Product

Phone

About Us

Inquiry

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send